Thursday, February 12, 2026
  • Login
No Result
View All Result
The Business Times
  • News
  • Economy
  • Financial Markets
  • Industry News
  • Energy
  • Global News
  • Insights
  • BT Exclusive
  • News
  • Economy
  • Financial Markets
  • Industry News
  • Energy
  • Global News
  • Insights
  • BT Exclusive
No Result
View All Result
The Business Times
No Result
View All Result
Home Economy

Lagos Commits to Four Week Expressway Rehabilitation Plan

byJoy Ogbitse
February 11, 2026
in Economy, News
0
13
VIEWS
Share on FacebookShare on Twitter


The Lagos State Government has confirmed it will shut parts of the Lagos–Abeokuta Expressway for a four week rehabilitation exercise starting February 11, 2026. The closure is a planned measure to address persistent structural failures along the highway. The move follows repeated complaints about deteriorating road conditions and reflects a coordinated intervention with the Federal Ministry of Works to stabilise key road sections and reduce long term maintenance risks.

The affected corridor lies between the U-Turn Bus Stop and the Sango Tollgate, impacting both inbound and outbound traffic flows. The Governor’s transportation office has stated the primary objective of this intervention is to repair failed portions of the carriageway and restore integrity to a critical transport artery linking Lagos with Ogun State.

The scope of work is constrained to the most distressed parts of the expressway and is intended to balance repair needs with continued traffic movement. To achieve this, the rehabilitation will be executed in two defined phases. The first phase, covering February 11 to March 4, focuses on the Abeokuta-bound lane. Under this arrangement, traffic from Lagos and Abule-Egba toward Abeokuta and Sango Tollgate will be routed onto a single operational lane positioned roughly 20 metres from the active work zone. Once one half of the carriageway is completed, traffic will be switched onto the rehabilitated section to allow work to proceed on the remaining half.

Phase two will run from March 4 to March 11 and shift attention to the Lagos-bound lanes between Obadeyi Bus Stop and Ekoro Junction. During this period, vehicles travelling toward Lagos and Abule-Egba from Abeokuta will similarly be diverted onto a single half of the road while repair activities continue on the adjacent section. This lane-by-lane execution seeks to preserve traffic flow and minimise disruption without compromising the quality and durability of the works.

Authorities have emphasised that adequate traffic management measures will remain in place throughout the four weeks. Motorists are advised to review travel plans, follow posted traffic signs, and comply with directions from traffic officials. The government’s communications underline that the phased approach and traffic counter-flow arrangements are deliberate strategies to maintain mobility even as critical repairs proceed.

This rehabilitation comes amid broader infrastructure maintenance efforts across major highways in Nigeria. The Lagos–Abeokuta Expressway, one of the nation’s busiest transport corridors, carries a high volume of daily traffic and has been a focus of periodic structural upgrades. Longstanding issues with surface failures and drainage stress have necessitated incremental rehabilitation interventions.

The planned repairs align with objectives to enhance road safety, reduce long-term maintenance costs, and support smoother logistics flows between Lagos and neighbouring regions. By sequencing work to limit obstructions and preserve a degree of continuous movement, officials aim to strike a practical balance between infrastructure renewal and economic activity along this vital route.

Tags: Abule-EgbaEkoro JunctionLagos State GovernmentLagos–Abeokuta ExpresswayObadeyi Bus StopSango TollgateU-Turn Bus Stop
Joy Ogbitse

Joy Ogbitse

Next Post

Tantalizers Plc Strengthens Entertainment Unit With N2billion Capital Injection

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recommended

NCC and CBN Introduce Instant Refunds for Failed Airtime and Data Purchases

NCC and CBN Introduce Instant Refunds for Failed Airtime and Data Purchases

1 month ago
US Places Partial Travel Restrictions on Nigerians Over Security, Visa Overstay Concerns

US Confirms Existing Visas Stay Valid Despite New Travel Limits

2 months ago

Popular News

  • Global Shipping Costs Hit Nigerian Consumers

    Africa’s ports are changing hands, but not in the way many people think

    0 shares
    Share 0 Tweet 0
  • Arik Flight Diverts to Benin Airport After Engine Anomaly

    0 shares
    Share 0 Tweet 0
  • South African Tycoon Tshepo Mahloele’s Harith Acquires FlySafair, Eyes Transport Network

    0 shares
    Share 0 Tweet 0
  • Dangote Refinery Cuts Petrol Price to N774/Litre

    0 shares
    Share 0 Tweet 0
  • Mombasa Billionaire Mohammed Jaffer’s Court Case Delayed Again

    0 shares
    Share 0 Tweet 0

Connect with us

Facebook Twitter Instagram TikTok

Newsletter

Pages

  • About Page
  • Contact
  • Privacy Policy
  • Terms

Navigation

  • News
  • Economy
  • Financial Markets
  • Industry News
  • Energy
  • Global News
  • Insights
  • BT Exclusive

© 2025 The Business Times NG .

Welcome Back!

OR

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Home
  • News
  • Economy
  • Financial Markets
  • Industry News
  • Energy
  • Global News
  • Insights
  • BT Exclusive

© 2025 The Business Times NG .