Thursday, November 19, 2026
  • Login
No Result
View All Result
The Business Times
  • News
  • BT Exclusive
  • Economy
  • Business
  • Financial Markets
  • Politics
  • Energy
  • Insights
  • Sports
  • News
  • BT Exclusive
  • Economy
  • Business
  • Financial Markets
  • Politics
  • Energy
  • Insights
  • Sports
No Result
View All Result
The Business Times
No Result
View All Result
Home Business

TTP Claims Ètò Cut Lagos Port Haulage Costs by 65%, Without Independent Audit

byStephen Abebor
November 16, 2026
in Business
0
TTP Claims Ètò Cut Lagos Port Haulage Costs by 65%, Without Independent Audit
11
VIEWS
Share on FacebookShare on Twitter

Truck Transit Parks (TTP) Limited says cargo transportation costs around Lagos ports have fallen by as much as 65 per cent since it introduced Ètò, its electronic truck call-up system. However, the company has not provided independently audited evidence establishing the scale of the savings.

TTP’s Managing Director and Co-founder, Jama Onwubuariri, made the claim in an exclusive interview with Nairametrics published on November 14, 2026. He attributed the reduction mainly to lower operating expenses, including fuel consumption, driver allowances, vehicle maintenance and the cost of prolonged waiting.

Before Ètò was introduced, trucks accessing Apapa and Tin Can Island ports could spend two to three weeks waiting for access, according to Onwubuariri. He said the period had generally fallen to two to three days under normal operating conditions.

TTP’s operational records also show that average in-terminal turnaround time during the first ten months of 2026 was 37 hours at Lagos Port Complex and 31 hours at Tin Can Island.

These figures measure the time trucks spend inside the terminals, rather than the entire period from booking to cargo delivery.

Ètò, launched in February 2021, requires truck operators to book electronically, proceed to designated holding parks and pre-gates, and enter the port corridors within scheduled access windows.

The arrangement is designed to replace unstructured queues with coordinated truck movements, reducing unnecessary journeys and improving vehicle utilisation.

According to Onwubuariri, the platform has coordinated more than four million truck movements since its introduction.

However, the 65 per cent cost reduction is not a new claim. At Ètò’s second anniversary in February 2023, TTP announced a similar reduction in cargo haulage costs.

BusinessDay reported on February 22, 2023, that TTP compared the previous minimum cost of moving containers from Apapa and Tin Can Island ports, put at ₦1.2 million, with about ₦420,000 after the system’s introduction.

The company repeated the 65 per cent claim in September 2025. The Guardian reported on December 11, 2025, that TTP attributed a reduction in haulage costs from as much as ₦1.4 million to between ₦350,000 and ₦500,000 to the electronic call-up system.

Separately, Leadership reported in 2026 that haulage charges on the Apapa-Ikeja route had fallen from about ₦700,000 in December 2025 to ₦240,000. The publication also reported a decline on the Apapa-Sango route from ₦800,000 to about ₦330,000, citing a haulage operator.

These comparisons suggest that transport costs have fallen on some routes, although the figures cover different periods and operating conditions and cannot establish a uniform reduction across the industry.

Onwubuariri acknowledged that the savings depend on other factors, including terminal efficiency, road conditions and operating expenses outside TTP’s control.

For importers and manufacturers, the bigger question is how much of the reduction reaches cargo owners and whether lower haulage expenses translate into cheaper goods for consumers.

An independent assessment comparing transport costs across routes, truck categories and periods before and after Ètò would help establish the actual savings.

Until such evidence becomes available, the 65 per cent reduction should be treated as TTP’s operational estimate rather than an independently verified industry-wide result.

Tags: Apapa Portcargo transportationEtoHaulage CostsLagos PortsLogisticsMaritime IndustryNigerian Ports AuthorityPort CongestionTin Can Island PortTruck Transit ParksTTP
Stephen Abebor

Stephen Abebor

Next Post
CAFA Targets $500bn African Fashion Economy, but Industry Baseline Remains Unclear

CAFA Targets $500bn African Fashion Economy, but Industry Baseline Remains Unclear

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recommended

UBS Lowers Global Oil Price Forecast as Supply Routes Recover Faster Than Expected

5 months ago

ExxonMobil Plans Massive Nigeria Oil Investment Expansion

7 months ago

Popular News

  • Reps Probe 22 States Over Unpaid Pensions as PenCom Raises Alarm

    Reps Probe 22 States Over Unpaid Pensions as PenCom Raises Alarm

    0 shares
    Share 0 Tweet 0
  • NEPC Warns Osun Loses Mineral Wealth to Illegal Mining, Raw Exports

    0 shares
    Share 0 Tweet 0
  • NANS Urges South-West Assemblies to Regulate Rent Increases, Agency Fees

    0 shares
    Share 0 Tweet 0
  • Lagos-Ibadan Expressway Gridlock Strands Commuters for Hours Over Aseese Bridge Works

    0 shares
    Share 0 Tweet 0
  • FAAC Shares N2.441trn for October as Oil-Related Revenue Sources Decline

    0 shares
    Share 0 Tweet 0

Connect with us

Facebook Twitter Instagram TikTok

Newsletter

Pages

  • About Page
  • Contact
  • Domestic Gas Sales Rise 30% as Nigeria’s Energy Reforms Gain Traction
  • Privacy Policy
  • Terms & Conditions

Navigation

  • News
  • BT Exclusive
  • Economy
  • Business
  • Financial Markets
  • Politics
  • Energy
  • Insights
  • Sports

© 2025 The Business Times NG .

Welcome Back!

OR

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Home
  • News
  • BT Exclusive
  • Economy
  • Business
  • Financial Markets
  • Politics
  • Energy
  • Insights
  • Sports

© 2025 The Business Times NG .